VERIFIED SOLUTION i
X

Connection between stages disappear upon reopening a flow in Spectrum

Issue

Upon saving a 'Job' in Enterprise Designer, it is saved without any error/warning but after reopening same in 'Enterprise Designer', connection between two or more stages disappear.

Flow Disconnection

Cause

This could be caused due to a defect present in earlier version of Spectrum. As a workaround, removing of a stage up and down the flow including affected stage and saving the 'Job' may work. 'Validate' option (available after Spectrum 11.0) may also give some more information on the reason of this behavior.
 

Resolution

UPDATED: November 16, 2018


It has been fixed in Spectrum 12.2.1 and later releases. After exporting the affected 'Job' from earlier version and importing it Enterprise Designer 12.2.1 (or later), all connections get restored.

Environment Details


 

Downloads

  • No Downloads