VERIFIED SOLUTION i
X

Resolve Confirm - Issue with calculations within the Structures Indicator List

Issue

Confirm - issues with calculations within the Structures Indicator List

 

Cause

Create an Inspection Batch against a Bridge Span and set the Grade of the Half Joint Observation Type to be 5D. This will set a BCI Critical to be 0.00. 

Run the Structures Condition Indicator List and see that the BCI Critical is blank

Resolution

UPDATED: April 18, 2017


The Structures Condition Indicator List now displays BCI Critical Scores of 0.00. Previously these Scores were displayed as blank.

This has been fixed in V15.1
 

Environment Details

Product Feature: Street Works

 

Downloads

  • No Downloads