VERIFIED SOLUTION i
X

Newly Scheduled plans do not run

Issue

Plans scheduled from Design Studio do not run as expected.

Cause

Plans scheduled from Design Studio do not run as expected. This issue has been reported on Sagent V6.7.2 and V6.8GA running on Windows 2008 R2 64 bit machine. In both the cases the time zone was PST (US and Canada) with daylight saving

Resolution

UPDATED: September 8, 2017


This issue has been fixed in Sagent V6.7.7 and V6.8.3.

As a workaround the steps shown in attached excel (Workaround-Scheduled Plans) can be followed.

Environment Details

Product Feature: Scheduler

Operating System: Windows 2008 R2 64Bit
 

Downloads

  • No Downloads