If Mail-pieces are schedules to be shipped on a later date, Mail-piece file/Job can be ingested in EngageOne delivery Audit after changing the 'Job Mailing date' in the Mail-piece/Job file. For example, If Job mailing date is Nov 6th in the Job file but actual date on which Mail-pieces are going to shipped is Nov 28th, Nov 6th can be replaced with Nov 28th, before ingesting it in the Mail360 Data Manager system.
In a Mail-piece/Job file, position of Job Mailing Date is from position 120 to 134.
In a Mail-piece/Job file, position of Job Mailing Date is from position 120 to 134.
UPDATED:
November 22, 2017