VERIFIED SOLUTION i

Plan not executing on schedule in Sagent

Product Feature: Scheduler
Operating System: Windows 2008 R2 64Bit
 

Issue

Plans scheduled from Design Studio do not run on scheduled time.

Cause

This could be caused due to a defect present before Sagent 6.8.3.

Resolution

UPDATED: September 19, 2019
This has been fixed in Sagent 6.8.3 so upgrading to 6.8.3 and later release should resolve this problem.